Research Article

Identification of Dam Construction Risks to Job Owners (Dam Construction in East Java)

Authors

  • Firman Yudi Pratama Faculty of Engineering, Department of Civil Engineering, Universitas Brawijaya, Indonesia
  • Achfas Zacoeb Faculty of Engineering, Department of Civil Engineering, Universitas Brawijaya, Indonesia
  • Ming Narto Wijaya Faculty of Engineering, Department of Civil Engineering, Universitas Brawijaya, Indonesia

Abstract

Approach to risk management, knowing the potential risks in realizing the construction of dam construction on the side of the work owner in the East Java area. In constructing a dam, construction on the job owner can affect the project's success. A practical risk management approach is carried out to achieve schedule, cost, quality, and service. This research aims to identify risks and provide a priority order of risks for the owner of the dam construction project in East Java that are most likely to occur to minimize the consequences arising from these risks. The identified risks will then be researched using the Failure Mode and Effect Analysis (FMEA) method. Then, the highest risk priority sequence will be obtained to determine the appropriate risk response in addressing these potential risks. In the next dam construction, the work owner will know the most significant potential risks to minimize cost overruns, time, and quality.

Article information

Journal

Journal of Mechanical, Civil and Industrial Engineering

Volume (Issue)

4 (2)

Pages

25-33

Published

2023-05-22

How to Cite

Identification of Dam Construction Risks to Job Owners (Dam Construction in East Java). (2023). Journal of Mechanical, Civil and Industrial Engineering, 4(2), 25-33. https://doi.org/10.32996/jmcie.2023.4.2.4

Downloads

Views

5

Downloads

8

Keywords:

Risk Identification, Risk Potential, Owner, FMEA

Similar Articles

1-10 of 15

You may also start an advanced similarity search for this article.